[nsg_ai_p1]
[nsg_ai_p2]
[nsg_ai_p3]
[nsg_ai_p4]
The timeline depends on site size, tree density, access, weather, and the deliverables requested. A smaller, straightforward assignment may move faster than a site that needs more coordination or additional survey data. AMI reviews the scope first so the schedule is based on the actual project, not a guess.
Availability depends on project scope, location, site access, travel requirements, weather, airspace, and requested deliverables. AMI reviews new work during regular business hours, Monday through Friday from 8:00 AM to 4:00 PM Eastern Time. The best next step is to send the site details and timeline for review.
Deliverables depend on the assignment, but they may include survey drawings, mapped tree locations, CAD-ready files, and supporting datasets for design or due diligence. If the project needs coordination with topographic, boundary, or construction information, that can often be discussed during scope review.
Cost depends on site conditions, tree count and density, access, travel, and the level of documentation required. A simple location survey is not priced the same as a more detailed package for design coordination. AMI quotes based on scope so the estimate matches the work needed.
Have a project that needs reliable surveying, LiDAR, or reality capture deliverables? Contact Aerial Metrology & Inspection to discuss your scope, timeline, and project requirements.
