[nsg_ai_p1]
[nsg_ai_p2]
[nsg_ai_p3]
[nsg_ai_p4]
The timeline depends on the site, access, deliverables, and how much coordination the project requires. A small, straightforward assignment may move faster than a corridor with multiple stakeholders, limited access, or hybrid data needs. The best way to get a realistic schedule is to share the location, scope, and target use so the team can review it before committing to timing.
After the fieldwork is complete, the data is processed and organized into the requested deliverables. That may include drawings, maps, profiles, point clouds, surface models, or CAD and GIS compatible files. If the project team needs clarification on the output, that can be addressed as part of the normal delivery workflow.
Cost depends on project scope, site access, deliverables, and the amount of coordination required. A corridor survey that needs only limited documentation will usually differ from a larger assignment that combines multiple collection methods or requires more detailed deliverables. A quote is most useful when it is based on the actual site and the intended use of the data.
Yes, AMI serves Sanford, Northeast Florida, and projects throughout Florida, with select projects in Alabama when the scope is appropriate. Availability depends on project scope, location, site access, travel requirements, weather, airspace, and requested deliverables. If the corridor extends beyond Sanford, the team can review the full project area before confirming fit.
Have a project that needs reliable surveying, LiDAR, or reality capture deliverables? Contact Aerial Metrology & Inspection to discuss your scope, timeline, and project requirements.
